KALVARI (S-21) submarine

The full index of our ship stamp archive
Post Reply
aukepalmhof
Posts: 7771
Joined: Thu Apr 02, 2009 1:28 am

KALVARI (S-21) submarine

Post by aukepalmhof » Tue May 08, 2018 7:43 pm

Built as a diesel electric attack submarine by Mazagon Dock Limited, Mumbai for the Indian Navy.
27 October 2015 launched as the INS KALVARI (S-21) she is the lead ship of her class of six submarines.
Displacement 1,615 ton surfaced, 1,775 ton submerged, dim. 67.5 x 6.2m, draught surfaced 5.8m.
Powered by four MTU 12V 396 SE84 diesel engines, speed surfaced 11 knot, submerged 20 knot.
Range 6,500 mile by 8 knot and 550 mile submerged by 4 knot.
Armament 6 – 533mm torpedo tubes for 18 SUT torpedoes or30 Naval mines. Also supports firing of SM-39 Exocet anti-ship missiles.
Crew 8 officers and 35 sailors.
14 December 2017 commissioned.

INS KALVARI (S21) is the first of the six Kalvari-class submarine currently in service with the Indian Navy. It is a diesel-electric attack submarine which is designed by DCNS (French naval defence and energy company) and was manufactured at Mazagon Dock Limited in Mumbai, India.
Etymology and motto
The ship inherits its name from INS KALVARI (S23) which served in the Indian Navy from 1967 to 1996. KALVARI is the Malayalam word for tiger shark, a deep-sea predator in the Indian Ocean. The name symbolizes agility, strength and predatory power. The tiger shark (Galeocerdo Cuvier) is a species of requiem shark which are found in tropical and temperate waters. The ship's motto is “Ever Onward” which represents the submarine’s zeal and indomitable spirit.
History and construction
The submarine was designated as Yard 11875 at Mazagon Dock Limited and construction began on 14 December 2006 with the first cutting of steel. The five separate sections of the submarine were welded together, called 'Boot Together', on 30 July 2014. She was undocked to a pontoon from the East Yard dock on 6 April 2015 in the presence of Defence Minister Manohar Parrikar. She is the first Indian Naval vessel to be built using a modular approach. After completing the important milestones of vacuum test and battery loading, she was launched at the Naval Dockyard on 27 October 2015 by Ritu Shrawat, wife of then CMD, Rear Admiral R K Shrawat (Retd). She was brought back to Mazagon Dock Limited for completion of the Basin trials and Harbour Acceptance trials phase. After conquering numerous challenges faced during the ‘Setting to Work’ phase and undergoing rigorous Harbour tests & trials to the complete satisfaction of the customer, she commenced sea trials on 1 May 2016. She was expected to be inducted into the Indian Navy fleet in 2012 but this was delayed.
The submarine successfully fired a torpedo and a Exocet SM39 Block 2 anti-ship missile in the Arabian Sea on 2 March 2017 during sea trials. She was delivered to the Indian Navy on 21 September 2017 after successful completion of sea trials. She was commissioned by Indian Prime Minister Narendra Modi on 14 December 2017 at Mazagon Dock Limited. Her commissioning officer is Captain S D Mehendale.
2018 In service.

Source: https://en.wikipedia.org/wiki/INS_Kalvari_(S21)
India 2017 5r and ms sg?, scott?
Attachments
Kalvari_(S-21)_-_3.jpg
2017 kalvari.jpg
2017 kalvari 1.jpg

Post Reply