Almirante Padilla
Posted: Thu Oct 16, 2008 3:18 pm
Destroyerr transport built Bethlehem Ship Building Corp 1945. Keel laid Nov 1943. Launched 12 Feb 1944. Compl 23 Feb 1945. 1400tn. Gen Electric turbo elec motor 12000shp. 2 screws 23.5knts. Arm one 5in and six 40mm AA guns. Comp 204. Troop cap 162. Built as USS TOLLBERG (APD-1, ex DE-593). Trans to Colombia 14 Aug 1965. Second ship of name, first being the ex USS GROTON which was trans to Colombia Feb 1947.
Colombia SG1311. SSS Ency